| Picture Album: Mosport is Undergoing A Heavy Face Lift |
|
|
PICTURES
Below is a corner by corner synopsis of the work ongoing.
-
Start/Finish Straight
- New pit wall.
- Guardrail drivers left moving back from track edge 5 meters for increased runoff.
- Michelin Pedestrian bridge extension over pit lane.
- Starters stand will be moved back.
- Corner One
- Further paving of drivers right past pit out, blending into entry of corner 2.
- Corner Two
- Runoff drivers' right has been raised to track edge grade.
- 2a runoff has been increased, drivers' right, with a slight incline added.
- Retaining wall drivers left has been replaced and moved back 6 meters.
- Corner Three
- Run out on drivers left covers more area and has been elevated
- Corner Four
|
|
|
| |
|
 |
 |
 |